Waste water line, longitudinal profile, trench volumes
Manholes and pipes are placed, levels come from the institution's rules. The longitudinal profile and trench volumes come out in the same chat.
8inspection manholes
297 mline
45 mmanhole spacing
2,526 m³trench excavation
What the program did
- Placed Ø1000 inspection manholes 45 m apart; took the invert levels from the İller Bankası (Turkey's municipal development bank) rules.
- Laid Ø300 corrugated pipes between the manholes automatically.
- Placed the longitudinal profile and calculated the trench volumes.
- Showed the line in 3D with its manhole bodies and pipes.
What the engineer approved
- Defined the position of the line, the manhole and pipe type and the institution to apply in the prompt.
- Assessing the low-cover warning reported by the program is the engineer's job.
Full video
This demo is cut from the video below. The link starts the video at the same point.
