Skip to content
CAD
TR EN
Try 30 days
Road and terrain · 0:50

Road: alignment, section, earthwork volumes

Alignment, design profile, typical section and corridor are built with a single prompt; cut and fill volumes are calculated.

294.6 malignment
R = 120 mhorizontal curve
712.7 m³cut
12.8 m³fill

What the program did

  • Drew the alignment and the design profile.
  • Built the corridor with the typical section with kerbs from the library.
  • Calculated the cut and fill volumes; reported the result of the KGM (General Directorate of Highways) check.
  • Showed the corridor in the 3D view.

What the engineer approved

  • Gave the horizontal curve radius and the design speed in the prompt.
  • Chose the typical section from the library.
Free for 30 days

Try it on your own project.

  1. Fill in the form; once your request is approved, the link to the installer arrives in your e-mail.
  2. Open the program and enter your name and phone number. The 30-day trial starts at that moment.
  3. Use it on your own project.

The trial is available once per computer. During the trial, DXF, Excel, CSV and LandXML outputs carry a "DEMO" stamp.

Your details are used to review your request, to send the installer link and to reply to you. Privacy notice (KVKK)