In-building services: four systems
Waste water, clean water, heating and rainwater lines are laid out with their risers and storey branches in a single prompt.
314lines
1,460 mpipe
22fixtures
2%waste water slope
What the program did
- Placed the risers and storey branches of the four systems.
- Showed the services inside the building in the x-ray view.
- Built the waste water branches at a 2% slope and reported that there is no reverse slope.
What the engineer approved
- Said which systems and fixtures were wanted.
- Choosing diameters and the services calculation is the engineer's job; the program draws the lines.
Full video
This demo is cut from the video below. The link starts the video at the same point.
